Percautions For The Removal Of Work 

The removal of work shall be done with utmost care, using tools and methods, to be approved by the Building Management that will not transfer any heavy shocks to the remaining portions of the building.  All possible care shall be taken to avoid vibration and other disturbances.

 

Erect and maintain all enclosures where required to control traffic, dust, etc. and remove an/or relocate same as required during the removal of existing work and at completion of work.

 

All trucks carrying loose, dry materials such as debris, broken concrete block, steel, wood members, windows, bricks, plaster, concrete, etc., shall be covered by tarpaulins to prevent blowing away or spillage of contents.  All spillage of whatever nature shall be promptly cleaned up and removed.